Nurulanis Ahmad@Mohamed
Coordinator Self Review Report (SRR) I

Tel    : 05-374 2698 Fax :  05-374 2451
email :Coordinator of SRR

Siti Hajar Noor Alshurdin
Coordinator Self Review Report (SRR) II

Tel    : 05-374 2698 Fax :  05-374 2451
email : Coordinator of SRR

 




INTRODUCTION

This division is responsible for managing and coordinating the preparation of SRR and PSRR. SRR is an assessment guideline for PTJ performance based on the institution or program's ability to meet all internal and external criteria regularly, allowing the system to discover and correct any internal flaws. The SRR is the result of the Self Review (SRR), which serves as a primary reference for External Review (ER). SRR needs to fulfil the COPIA standards, as well as the findings of earlier IQA and ER tests and the QMS process. PSRR is also a report generated by each program on a regular basis to detect and improve program or system flaws. The Program Coordinator is in charge of this report, which is managed by the SRR main committee. PSRR is required to meet all of the COPPA standards.

SRR TEAM

Cik Nurulanis Ahmad@Mohamed (Penyelaras Self Review Report (SRR) I)
Pn. Siti Hajar Noor Alshurdin  (Penyelaras Self Review Report (SRR) II)
Prof. Madya Ts. Dr Norhafizah Abdul Rahman
Sr. Dr Kartina Alaudin
Dr Suriati Ahmad
Dr Azizah Md Ajis
Puan Hjh. Khalijah Ramli 
Puan Jufiza A Wahab 
Puan Maizura Meor Zawawi
Cik Haslinawati Che Hassan
Puan Ima Shanaz Wahidin
Encik Zulkarnian Hassan 
Puan Nurul Aimi Zakaria 
Puan Nor Faezah Mohamad Razi 
Encik Mohd Saleh Abdul Wahab 
Cik Azira Ibrahim 
Puan Noor A’yunni Muhammad 
Encik Zulkifli Mohd Ghazali
Puan Nur Adibah Nadiah Mohd Aripin 

ROLES

Roles of Self Review Report (SRR) & Programme Self Review Report (PSRR)

  • Identify the strengths, weaknesses, opportunities, and challenges of PTJ and the institutional quality system.
  • Improving weaknesses in a program and the development of institutional quality system.
  • Plan, control and review the operation of the institutional quality system process.

SRR and PSRR mechanisms

To ensure a continuous quality assurance system is implemented, SRR and PSRR are assigned to PTJ. The implementation of SRR and PSRR reporting will be the main reference material for the External Review (ER). The results will be reviewed and discussed by the top management, and solutions will be proposed for any issues that occur.

Roles of Self Review Report (SRR) & Program Self Review Report (PSRR)

SRR is an assessment guideline for PTJ performance based on the institution or program's ability to meet all internal and external criteria regularly, allowing the system to discover and correct any internal flaws. The SRR is the result of the Self Review (SRR), and it serves as a primary reference for External Review (ER).

Job Scopes of Self Review Report (SRR) & Programme Self Review Report (PSRR)

SRR: All PTJs are obliged to generate a yearly SRR in accordance with InQKA requirements. These reports detail an institution's development and accomplishments during a given time period. To guarantee excellent system operational management, the SRR report must adhere to the COPIA requirements as well as the IQA and ER findings.

PSRR:PTJ needs to conduct a comparable review utilizing the COPPA standard at the program level (Program Coordinator). Similar evaluations by other units and departments should be referred to by the Committee and consolidated into a comprehensive SRR for PTJ. This report will be audited, and critical remarks on the program's delivery over a set period of time will be provided.

The SRR annual report will be submitted to top management for further discussion and resolution will be taken into consideration to address areas of concern.

PLANNING