Print
Hits: 2063

<BACK

Expert Field: Industrialized Building System (IBS), Decision support system (DSS),
Project planning and scheduling Construction economic innovation in construction method
University & Year:
University of Salford, Greater Manchester, UK, 2013
Contact: This email address is being protected from spambots. You need JavaScript enabled to view it.
Link On Research Gate : https://www.researchgate.net/profile/Mohd_Rofdzi_Abdullah
Link On Google Scholar : https://scholar.google.com/citations?user=jb_gG08AAAAJ&hl=en
Other Link (Blog/Facebook):


Profile

ACADEMIC QUALIFICATION

PROFESSIONAL MEMBERSHIP

Research

1. “BIM Adoption Model in Achieving Quality of Life within Construction Organisation’, Geran Khas Insentif Penyeliaan Perak (GKIPP) :16/2/2018-15/2/2019 (On Progress) Kos : RM 3,000.00

2. “Best Practices of IBS Implementation” for Malaysian Productivity Council (MPC)-National, RM10,000.00 (Completed 2014).

3. “Criteria Selection Framework For Industrialised Building System In  Housing Project In Malaysia”; CREAM/CIDB MALAYSIA – UiTM; (November 2010 – November 2015 : Kos : RM 500,000.00 `

4. “Kriteria Kejayaan Projek Pembinaan Hospital Awam Di Malaysia–Mengukur Kecekapan Proses”, Institut Penyelidikan, Pembangunan dan Pengkomersilan UiTM Shah Alam, - ( Ahli Penyelidik: Hayroman Ahmad (Ketua), Mohd Rofdzi Abdullah,  Wan Akmal Zahri Wan Zaharuddin) – 1 Jun 2004 – 31 Mei 2005 :  Kos RM 12,857.00

5. “Amalan Dan Teknik Menender Kontrak Pembinaan”, Institut Penyelidikan, Pembangunan dan Pengkomersilan UiTM Shah Alam, - ( Ahli Penyelidik: Mohd Rofdzi Abdullah (Ketua),  Syed Abdul Haris Syed Mustafa, Wan Abdullah Wan Alwi) – 1 Mei  2005 – 30 April 2006 : Kos RM 13,631.20.

Publication

1. Wan Nur Shazwani bt Wan Mohammad, Mohd Rofdzi Abdullah, Sallehan Ismail, Roshana Takim, Overview of Building Information Modelling (BIM) Adoption Factors For Construction Organisations, IOP Conference Series: Earth and Environmental Science, Vol 140, Issue 1, Pg 012107,  IOP Pubishing,2018

2. Mohd Najib Abd Rashid, Mohd Rofdzi Abdullah, Dzulkarnaen Ismail, Muhammad Naim Mahyuddin, Towards Automation And Robotics In Industrialised Building System (IBS): A Literature Review, 2018

3. Wan Nur Shazwani bt Wan Mohammad, Mohd Rofdzi Abdullah, Sallehan Ismail, Roshana Takim, Building Information Modeling (BIM) Adoption Challenges for Contractor’s Organisations in Malaysia, AIP Conference Proceedings, Vol.2016, Issue 1, Page 020148, 2018.

4. Wan Nur Shazwani bt Wan Mohammad, Mohd Rofdzi Abdullah, Sallehan Ismail,Understanding the Concept of Building Information Modeling: A Literature Review, 2018.

5. ABDULLAH, M. R. & EGBU, C. O. The Application of Analytical Hierarchy Process (AHP) as a Decision Tool in Choosing the type of Industrialised Building System (IBS) for housing projects. .  ARCOM 2011, Monday 6th to Wednesday 8th September 2010, 2011 University of West England, Bristol.

6. ABDULLAH, M. R. & EGBU, C. O. A Selection Criteria Framework (SCF) for Choosing Industrialised Building Systems (IBS) in Housing Projects.  ARCOM 2010, Monday 6th to Wednesday 8th September 2010, 2010b Leeds University, UK.

7. ABDULLAH, M. R. & EGBU, C. O. The Role of Knowledge Management (KM) in Improving the Adoption And Implementation Practices of IBS in Malaysia.  CIB World Congress 2010, 10-12 May 2010, The Lowry, Salford Quays, Greater Manchester, UK.

8. ABDULLAH, M. R. & EGBU, C. O. Industrialised Building System in Malaysia: Issues for Research in a Changing Financial and Property Market. In: ALSHAWI, M., AHMED, V., EGBU, C. & SUTRISNA, M., eds. BUHU 9TH International Post Graduate Conference 2009, 29-30 January 2009, The Lowry, Salford Quays, Greater Manchester, UK.

9. ABDULLAH, M. R. & EGBU, C. O. 2009. A Consideration of Key Issues in the Implementation of IBS in Malaysia. 4th Scottish Conference for Postgraduate Researchers of the Built and Natural Environment - PROBE 09 Glasgow Caledonian University, Glasgow, Scotland, UK.

10. KAMAR, K. A. M., ALSHAWI, M., HAMID, Z. A., NAWI, M. N. M., HARON, A. T. & ABDULLAH, M.R., Industrialised Building System (IBS): Identifying Critical Success Factors (CSFs) For The Transformation of Contractors, 2nd Construction Industry Research Achievement International Conference - CIRAIC 2009, 3rd – 5th November 2009 2009 Legend Hotel, Kuala Lumpur, Malaysia

11. KAMAR, K. A. M., ALSHAWI, M., HAMID, Z. A., NAWI, M. N. M., HARON, A. T. & ABDULLAH, M.R. Industrialised Building System (IBS): Revisiting the Issues on Definition, Classification and The Degree of Industrialisation.  2nd Construction Industry Research Achievement International Conference - CIRAIC 2009, 3rd – 5th November 2009 Legend Hotel, Kuala Lumpur, Malaysia

12. KAMAR, K. A. M., ALSHAWI, M., HAMID, Z. A., NAWI, M. N. M., HARON, A. T. & ABDULLAH, M.R. Industrialised Building System (IBS): A Review Of Experiences in UK and Malaysian Construction Industry. 2nd Construction Industry Research Achievement International Conference - CIRAIC 2009, 3rd – 5th November 2009 2009 Legend Hotel, Kuala Lumpur, Malaysia

13. NAWI, M N, KAMAR K. A. M, LEE, A., HAMID, Z., ABDULLAH, M. R, HARON, A. T, AND ARIFF M (2009), Enhancement of Constructability Concept: Experience of Malaysian Offsite Construction Industry, paper proceedings of International Conference, Amsterdam, Netherland.

14. MOHD ROFDZI ABDULLAH, SYED ABDUL HARIS  SYED MUSTAPA DAN WAN ABDULLAH WAN ALWI, Amalan dan Teknik Menender Kontrak Pembinaan oleh Kontraktor Kelas A di Malaysia, Conference on Scientific & Social Research 2007, Petaling Jaya, Selangor.

15. MOHD ROFDZI ABDULLAH, AND SYED ABDUL HARIS  SYED MUSTAPA, Key Factors Determining the Success of Implementing the MS ISO 9000 in the Malaysian Construction, Firm, 9th Pacific Association of  Quantity Surveyor (PAQS), Dalian, China, 12th  July 2005

Consultation

a) PhD / Doktor Falsafah:

1. Wan Nur Shazwani Wan Mohamed , PhD in Design and Built Environment, UiTM Cawangan Perak, “A Strategic Framework of Building Implementation Modelling (BIM)for Construction Organisation ”  (2017- Present): In Progress

2. Mohd Najib Abd Rashid , PhD in Design and Built Environment, UiTM Cawangan Perak “A Framework to Automation and Robotics in Industrialised Building System (IBS)“ (2018 - Present): In Progress


b) MSc / Sarjana:

1. Salmiah Aziz , MSc in Green Architecture, UiTM Cawangan Perak “Optimising Modular Design for Affordable Housing” 2015 -Present : In Progress (Viva).

2. Ahmad Firdaus Abd Latif , MSc in Green Architecture, UiTM Cawangan Perak “Retrofitting University Building Towards Improving Energy Performance Through Building Information Modelling (BIM) Adaptation” 2015 -Present : In Progress (Viva).

Consultation:

1. Fasilitator / Pengajar Modul sempena Program dan Latihan Kursus Aplikasi MS Project Untuk Pelajar Kolej Vokasional Seri Iskandar (MSPKVSI), Makmal Komputer BM108, Bangunan FSPU (QS), UiTM Perak, 23 – 26 NOVEMBER 2015 (Isnin – Khamis).
2. Fasilitator / Pengajar Modul sempena Program dan Latihan Kursus Aplikasi ‘MS Project 2010’  Untuk Pelajar Kolej Vokasional Seri Iskandar (MSPKVSI), Makmal Komputer BM108, Bangunan FSPU (QS), UiTM Perak, 16 – 18 NOVEMBER 2016.
3. Penceramah sempena Kursus Latihan Kursus ‘Contract and Procurement Procedure (CPP)’ dan ‘Specification, Quality And Personnel Management (SQPM)’ Untuk Pensyarah Kolej Vokasional Seluruh Malaysia di dHotel, Seri Iskandar, Perak , 4hb – 7hb October 2016.
4. Researcher and Book Writer: “Best Practices of IBS Implementation” for Malaysian Productivity Council (MPC)-National, RM10,000.00 (Completed 2014).
5. Fasilitator: “Kursus Kaedah Laluan Kritikal (Critical Path Method- CPM) dan Microsoft Project”, K-Builders Sdn Bhd and Pusat Khidmat Kontraktor (PKK) Trengganu, Kuala Terengganu, 6-8th  Sept 2004
6. Fasilitator: “Professional Architectural Practice”, Pangkor Island, Perak, Malaysia. Anjuran IKM, P. Pangkor, 23-27th June 2003

Graduate Employability Projects:
1. Kursus Kebolehan Pasaran Graduan FSPU dibidang Kepakaran Perisian ‘Building Information Modelling (BIM) – Autodesk Revit For Designers’ 6hb - 8 November 2015 (Jumaat – Ahad) di BM 108, FSPU (QS), UiTM Perak.
2. Kursus Kebolehan Pasaran Graduan FSPU dibidang Kepakaran Perisian ‘Building Information Modelling (BIM) – Autodesk Revit For Designers’ 17hb - 30 Ogos 2016 di makmal IlQAM, FSPU (BS), UiTM Perak.
3. Kursus BIM ToT and GE- Revit Architecture: Pelajar Sem Akhir Design Base UiTM Caw Perak, Seri Iskandar, pada 26 Jan - 09 Feb 2017, di BIM Lab, UMP Pahang.
Teaching Mobility Projects:
1. “Building Information Modelling – An Introduction” Venue: School Of Science & Engineering, Politeknik Brunei, Brunei Darul Salam, 23-29 April 2018


Income Generation Projects:
1. Program dan Latihan Kursus Aplikasi MS Project Untuk Pelajar Kolej Vokasional Seri Iskandar (MSPKVSI), Makmal Komputer BM108, Bangunan FSPU (QS), UiTM Perak, 23 – 26 NOVEMBER 2015 (Isnin – Khamis), Pendapatan : RM 13,416.00
2. Program dan Latihan Kursus Aplikasi ‘MS Project 2010’  Untuk Pelajar Kolej Vokasional Seri Iskandar (MSPKVSI), Makmal Komputer BM108, Bangunan FSPU (QS), UiTM Perak, 16 – 18 NOVEMBER 2016, 29 Peserta, Pendapatan : RM 16,500.00
3. Pengendalian Latihan Kursus ‘Contract and Procurement Procedure (CPP)’ dan ‘Specification, Quality And Personnel Management (SQPM)’ Untuk Pensyarah Kolej Vokasional Seluruh Malaysia di dHotel, Seri Iskandar, Perak , 4hb – 7hb October 2016, Pendapatan: RM 32,310.00